I have posted previously about the hot springs project here in Metung but this post will let you see that some action is now taking place.
This is the area behind this particular sign.
There are other signs at other parts of the Hot Springs location. The grass has been mowed and some of the dead trees have been removed. The yellow posts in the distance is where the hot water was tapped.
The work that has been done is a massive amount of tree planting which indicate the boundary of the springs project.
The project backs on to an area that is slowly developing with new houses gradually being built and blocks slowly being sold.
It looks quite alien the gates that have been installed as there are no fences and no pathways.
It is so good to see that something is happening at last.
The trees and shrubs will take a while to grow as they are only tube stock, almost impossible to see in their guard.